ACAP Available Capacity
ACR Assigned Commissioner's Ruling
AMP Automatic Mitigation Procedure
APPA American Public Power Association
AS Ancillary Services
ATC Available Transfer Capacity
BPA Bonneville Power  Administration
CAISO California Indepdendent System Operator
CDWR California Department of Water Resources
CMUA Calif. Municipal Utilities Association
C-O Contingency Only
COG Constrained Output Generator
CP Coincident Peak
CPUC Calif. Public Utilities Commission
CRR Congestion Revenue Rights
CTA Competitive Transition Account
CTC Competitive Transition Charge
DA Day Ahead
DAM Day Ahead Market
DCBC Damage Control Bid Cap
DEC Decremental Price
DSC Debt Service Coverage
DSM Demand Side Management
ETC Existing Transmission Contracts
FAT Factory Acceptance Test
FERC Federal Energy Regulatory Commission
Firm LD Firm Liquidated Damages
FMU Frequently Mitigated Units
FNM Full Network Model
FOO Flexible Offer Obligation
FTR Firm Transmission Rights
GFT General Fund Transfer
HASP Hour Ahead Scheduling Process
ICAP Installed Capacity
IFM Integrated Forward Market
IOU Investor Owned Utility
IPP Intermountain Power Project
IPP Intermountain Power Agency
IRP Integrated Resource Plan
KW Kilowatt
kWh Kilowatt hours
LAP Load Aggregation Point
LARS Local Area Reliability Study
LDF Load Distribution Factors
LMP Locational Marginal Pricing
LMPM Local Market Power Mitigation
LRA Local Regulatory Authority
LSE Load Serving Entity
MCP Market Clearing Price
MLCC Minimum Load Cost Compensation
MMbtu Million British Thermal Units
MOO Must Offer Obligation
MRTU Market Redesign Technology Update
MSS Metered Subsystem
MW Megawatt
mWh Megawatt Hours
NCP Non Coincident Peak
NERC North American Electric Reliability Council
NRC Nuclear Regulatory Commission
OOM Out of Market
OOS Out of Sequence
PAC Power Agency of California
PBC Public Benefits Charge
PGA Participating Generator Agreement
PL Participating Loads
PTO Participating Transmission Owner
QF Qualifing Facility
RA Resource Adequacy
RAR Resource Adequacy Requirements
REC Renewable Energy Credit
RERC Riverside Energy Resource Center
RMC Risk Management Committee
RMR Reliability Must Run
RPS Renewable Portfolio Standard
RPU Riverside Public Utilities
RSI Residual Supply Index
RT Real Time
RTO Regional Transmission Organization
RUC Residual Unit Commitment
SAIDI System Average Interruption Duration Index
SAIFI System Average Interruption Frequency Index
SC Scheduling Coordinator
SCADA Supervisory Control and Data Acquistion
SCED Security Constrained Economic Dispatch
SCPPA Southern Cal. Public Power Authority
SCUC Security Constrained Unit Commitment
SFT Simultaneous Feasibility Test
SMD Standard Market Design
SO1 Standard Offer 1
SONGS San Onofre Nuclear Generating Station
SQMD Settlement Quality Meter Data
SU/ML Start Up/Minimum Load
T&D Transmission & Distribution
TAC Transmission Access Charge
TCA Transmission Control Area
TCC Transmission Congestion Contract
TO Transmission Owner
TOR Transmission Ownership Rights
TRBAA Transmission Revenue Balancing Account Adjustment
TRR Transmission Revenue Requirement
UDC Utility Distribution Company
UDP Uninstructed Deviation Penalties
UFE Unaccounted For Energy
WSPP Western Systems Power Pool