
In designing a project, especially a project at least one acre in size, pollution prevention measures are required as part of the final project design. These pollution prevention measures shall be designed to meet or exceed minimum treatment levels, which vary based on the project type.
Listed below are guidelines and forms to help comply with this post-construction requirement.
(Note: To access these guidelines and forms, you will be redirected to the Riverside County Flood Control and Water Conservation District website.)
For the City's WQMP Template, please see the Land Development page.
|
Address: 5950 Acorn Street Riverside, CA 92504 Stormwater: (951) 826-5341 Wastewater: (951) 351-6140-5341 Hours |
|
| Mon - Fri | 7:30am - 4:30pm |
| Closed on Weekends and Major Holidays | |