City Engineering

City Engineering

City Wide Adjust Sewer Manhole to Grade, Cured in Place Pipe (CIPP) Liner

Construction Begins

 

During Construction

  • bid 7073 during construction photo
  • bid 7073 during construction photo

Project Summary

Cost: $515,095.00
Status: Completed
Start Date : 09/04/2012
End Date : 12/21/2012
Ward : 7
Contact:
  Steve Howard Brandi Becker
  Chief Construction Inspector Senior Administrative Analyst
  951-712-3904 951-826-2306

Description

This project consists of the following work:

  • Replacement of an existing 8-inch Vitrified Clay Pipe sanitary sewer along Bolivar Street (Bleeker Court to Campbell Avenue).
  • Replacement of an existing 8-inch Vitrified Clay Pipe sanitary sewer along Sierra Vista Avenue (Gedney Way to Richmond Street).
  • Installation of sewer clean-out structures at the property line, sewer manholes and sewer laterals.
  • Adjusting buried manholes to grade and lining existing sewer main with cured in place pipe (CIPP) liner.

Master Plans
Construction Projects
Construction Projects
General Information
Address:
3900 Main Street - 4th Floor
Riverside, CA 92522

Phone: (951) 826-5341

Hours
Monday - Friday 7:30am - 5:30pm
Closed Major Holidays
City of Riverside  |  Explore Riverside  |  At Home in Riverside  |  Seizing Our Destiny
Copyright © 2014 City of Riverside | Accessibility Policy | Website Disclaimer | Privacy Policy
Facebook: Like the City of Riverside LinkedIn Twitter YouTube: Subscribe to the City of Riverside RSS: Stay up-to-date with the latest news from the City of Riverside GovDelivery: Receive email alerts from the City of Riverside GTV: City of Riverside's television channel Outlook E-News
Printed from: http://www.riversideca.gov/publicworks/engineering/bid7073.asp