Tequesquite Arroyo Sewer Trunk Replacement-Phase 2

Cost: $3,207,720.00
Status: Under Construction
Start Date : 12/06/2012
Completion Date: 08/05/2014
Ward : 1, 2
Contact:
  Steve Howard Brandi Becker
  Project Manager Senior Administrative Analyst
  951-826-5708 951-826-2306

Project Description

Before photo of sewer trunk replacement projectThe scope of work includes installation of 36 inch diameter Vitrified Clay Pipe (VCP), bore and jack 36 inch diameter VCP Microtunneling pipe in a 60 inch diameter steel  casing at the 91 Freeway, BNSF and UP Railroad crossing, installation of 8 inch diameter and 36 inch diameter VCP open trench method, and installation of 36 inch diameter VCP Microtunneling pipe by microtunneling method. Also included are sewer manholes and deep shaft sewer manholes.

Master Plans
Construction Projects
Construction Projects
General Information
Address:
3900 Main Street - 4th Floor
Riverside, CA 92522

Phone: (951) 826-5341

Hours
Monday - Friday 7:30am - 5:30pm
Closed Major Holidays
City of Riverside  |  Explore Riverside  |  At Home in Riverside  |  Seizing Our Destiny
Copyright © 2014 City of Riverside | Accessibility Policy | Website Disclaimer | Privacy Policy
Facebook: Like the City of Riverside LinkedIn Twitter YouTube: Subscribe to the City of Riverside RSS: Stay up-to-date with the latest news from the City of Riverside GovDelivery: Receive email alerts from the City of Riverside GTV: City of Riverside's television channel Outlook E-News
Printed from: http://www.riversideca.gov/publicworks/engineering/bid7042.asp